To support installation recovery after attack, the Air Force required a tool for managing airfield damage repair to enable an operator to manage the personnel, vehicles, and materials used during the recovery of an installation. IRAA provides this support for the Airfield Damage Repair (ADR) Program of Record (PoR) and is used in both Garrison and Expeditionary environments by personnel at all echelons of the Air Force: Squadron, Group, Wing, and MAJCOM.
To support installation recovery after attack, the Air Force required a tool for managing airfield damage repair to enable an operator to manage the personnel, vehicles, and materials used during the recovery of an installation. IRAA provides this support for the Airfield Damage Repair (ADR) Program of Record (PoR) and is used in both Garrison and Expeditionary environments by personnel at all echelons of the Air Force; Squadron, Group, Wing, and MAJCOM.
IRAA integrates data and information from multiple data sources and provides a much needed capability to manage repair team configurations including vehicles, equipment, personnel, warehouses, and batch plants; and to provide personnel recommendations based on Air Force Specialty Codes (AFSC) and personnel licensing.
IRAA performs repair material calculations and determines expected repair times based on repair size, repair type, and equipment performance parameters. IRAA also has the ability to account for, and plan for, issues encountered during the repair process and to show the effects on the current schedule. In addition, real-time repair team status, timelines, schedules, and production graphs are visualized in the IRAA dashboard enabling commanders to make better informed decisions in the ADR process.
Manage a master personnel roster; including AFSC, rank, name, qualifications, location, and training for each individual
Manage a master equipment list; including consumption and production rates, fuel levels, and status
Manage repair materials; including type, quantity on hand, and storage locations
Manage repair teams and their make up; including vehicles, personnel, warehouses, and batch plants
Manage UXO mitigation status
Manage identified craters and repair zones including assignment to repair teams
Manage the damage repair process and repair zones in real time as damage is repaired
Manage repair quality for every repair team and repair zone completed
Manage project timelines; including projected schedule and completion time
Visualize production graphs and schedule; including charts per team and heat charts
Account for injections of issues during the repair process and to show the effects on the existing schedule
Account for logistics; including transportation times and management of warehouse storage locations and material management
Manage at the team level, and report at the Emergency Operation Center (EOC) level
Import and export functionality including simple and complex data transformations (e.g. export of damage spatial features for import into GeoExPT)
Integrate data from other data sources, including but not limited to GeoExPT and Automated Civil Engineer System Personnel Readiness (ACES-PR)
Generate various reports (e.g., team production, schedule, and team list)